inches
lbs
How do these parts arrive at the FPI line, from the previous process?
Will this Equipment be Certified to ASTM E 1417?
Penetrant application
feet
Additional processes required/interested
Could you share your Local Process Specification (LPS)
inches
lbs
Any additional special consideration?
How do these parts arrive at the FPI line, from the previous process?
feet
Additional processes required/interested
Could you share your Local Process Specification (LPS)
inches
Cycles Per Minute
lbs
feet

How do these parts arrive at the Piece of equipment, from the previous process?

Product transportation
Test configurations needed
Do you have a machine length limitation in your lab space?
Do you need sample heating or cooling?
Specification Compliance (choose all that apply)
Penetrant Specifications (choose all that apply)
Magnetic Particle Specifications (choose all that apply)
Please fax (906-337-2930) or email  (rel@relinc.com) your print or 
specifications.
CAPTCHA